Tuesday, 10 August 2010

Preparing to restore the French Burr stones

The second pair of stones in the mill are French Burrs, which were used to mill wheat flour. Like the first pair, these stones have not operated since WWII.

Naturally, we would like to restore these stones to working order with the intention of milling some flour in due course.

There are several problems - we have no idea what state the stone faces or bearings are in, the support beam is twisted, the stone nut is mounted too high on the shaft to mesh with the spur wheel, and it is also too close to the spur wheel so the gears cannot engage. Apart from that and the fact they are enormously heavy (over a ton each), it looks quite simple. Oh, and there is no beam in the roof in a suitable position to attach a lifting block.

So, the first step is to fit a lifting beam. After lots of calculations to work out how big a beam we needed to span the 3m gap between roof timbers above stones 2 and 3, we eventually ordered a length of oak, 3.5m long and 20cm square. On August 10th this 150kg monster was dragged across the yard on rollers and then pulled in through the half-door by a hoist attached to existing timbers. By using hoists in various positions, and extra manpower provided by Chris Braithwaite, we eventually got it lifted into place.


The lifting beam in position with 3 ton chain block

07/09/2010 We fitted blocks to the ends of the beam to stop it slipping out. During the hammering a bat fell out of the roof. Following instructions, we picked it up (wearing gloves) and stuck it on the wall, from where it flew back to safety.

Tuesday, 22 June 2010

Repairing the Sluice

13/04/2010 Sluice gate has collapsed under water pressure due to rot.


The new sluice gate

At first we inserted plywood boards to reduce water flow.
Removed side posts (grooved for sluice gate boards), which were cemented into channels cut in stonework. Make new boards and design and manufacture new sluice valve with steel blade and slides and screw control. Install new sluice mechanism. Replace rotting bridging boards with more stable arrangement.

01/06/2010 Make new weir handrail from scaffolding sections.

08/06/2010 Weir handrail fitted
- adjusting the sluice was previously a hazardous activity.
15/06/2010 Finishing fixing of weir handrail.

22/06/2010 Further work on weir handrail.

28/09/2010 Wheel control added.

Tuesday, 16 December 2008

Restoring the winnower


The original winnowing machine at Acorn Bank mill has long since disappeared, but a hand-operated machine, originally from a local farm, was on the site. It was in a very sorry state, having been used as a sawbench, attacked by woodworm, and left to rust and rot. We decided to try to restore it.

This is how it looked in March 2008 before we started work...

As the machine is not part of the Acorn Bank estate, and as there are plenty of surviving winnowers around (Heatherslaw Mill and Aberystwith Museum to name but two), it was decided to restore the machine so that visitors could see how it worked rather than stick to strict accuracy.






The restoration included various woodworking tasks - making leg extensions to replace the parts that had rotted away, making grain chutes etc, as well as treating inside and out with preservative. The mechanical parts were stripped down completely, cleaned and painted with matt black Hammerite before being reassembled. All of the sieves had rusted away, so we replaced the coarsest one by weaving it from wire, the next by using 1cm wire mesh and the finest using a discarded fireguard. The paddles in the fan were replaced with plywood and finally the curved front cover (originally metal, but completely rusted away) was replaced with clear plastic so that the works could be seen.


...and this is the finished restoration

Tuesday, 30 October 2007

New main shaft - 30/10/2007

The main shaft fitted during the mill restoration in 1991 had rotted and broken during 2005 and the mill could no longer turn. Acorn Bank Volunteers Richard Harland and Bob Price joined Tim Martin of Context Engineering in October 2007 to help fit the new main shaft Tim had made and replace all the 12 spokes of the waterwheel.

Tim Martin of Context Engineering fits the last of the 12 new spokes

In March 2008 Tim, Richard and Bob were joined by the third volunteer, Ray Gill, when they adjusted the wedges to balance and centre the waterwheel and pitwheel on the new shaft.