Wednesday, 14 November 2012

Another busy Tuesday

Before we started, we had to have a picture of
all 3 of us with our Marsh Heritage Award

 We carried on fitting the first pulley for our revised sack hoist, first filing out the casting to fit the bolt we used as axle, then mounting it between the wooden supports.  We gave a lot of thought to the lift itself, as it would be useful to be able to hoist our "Really Useful" boxes as well a sacks.  A platform, with or without sides, attached by chains which would open the trapdoor, seemed to be favourite.  We also removed the stop mechanism actuator from the old sack hoist because it was in the way.  In the process we revealed quite a lot of woodworm activity in the roof truss - fortunately only in the outer few mm.

Richard carried on fitting the discs to the No 1 stone nut, and George and Mike cleared 8 barrowloads of rubble from the pit.  We fitted a bolt to the new "gate" across the front of the kiln.

Later we dismantled the tun and lifted the No 2 runner stone so we could hoover out all the grain and stuck flour.  We left the stone supported on blocks so we can lift it fully and check the bearing


Monday, 12 November 2012

Presentation of the Marsh Heritage Volunteering Award

Bob and Richard receive the award from
Brian Marsh applauded by Dame Fiona Reynolds

On Saturday November 10th Bob and Richard, with Sylvia, attended the AGM of the National Trust to collect their Marsh Heritage Award.

The AGM itself was much more interesting than we had expected.  The big names at the helm of the Trust, particularly the Chairman Simon Jenkins, proved to be very good at fielding questions from the floor and delivering thoughtful and believable answers.

The meeting was dominated by the departure of  the Director General, Dame Fiona Reynolds.  She had obviously created a powerful impression on those she worked with, and earned deep respect and loyalty.  The tributes paid to her were very fulsome and emotional.
Brian Marsh poses with us and
our plaque and certificate

The time finally came for us to go up on the stage and receive our plaque and certificate from the founder and chairman of the Marsh Christian Trust, Brian Marsh, to loud applause from the large crowd of members at the meeting.

This may not be the place to discuss it, but I couldn't help feeling there is a disconnect between the lofty ideals of Simon Jenkins & co and the reality of the 67,000 volunteers who are mainly loyal to their property rather than the abstraction of the Trust.





The Plaque

The Certificate

Tuesday, 6 November 2012

Access to the kiln

Richard surveys the
newly-hinged fence
We spent today fixing supports and hinges to the fence in the kiln room so that we could swing it out of the way to improve access.  Anything is better than having to climb the fence every time, especially for those of us with short legs.

Richard continued to file the steel discs for the shelling stone stone-nut to improve their fit on the taper.

We also removed the handle and main gear from the winnower so the handle shaft can be repaired.

Tuesday, 30 October 2012

Shelling stones and sack hoist continued

 The mild steel plates to improve the fit of the shelling stone stone nut have come back from the engineering works, cut out, drilled and tapped. We cut the lengths of 14mm studding and started to file the plates to improve the fit still further.  We need to refit the shelling stone before we can continue with the...
...sack hoist.  We took down two pulleys that had been used by the original restorers as part of the inoperable sack hoist.  After cleaning them up we gave them a coat of red oxide primer.  We cut some 10mm studding and two angle-iron plates to clamp timbers to one of the roof beams to carry the first pulley over the trap doors.  Ray is gong to make two further wooden pulleys to direct the rope under the hurst frame.

Meanwhile sorting of the stone in the kiln started, and some of the dirt and rubble was removed from the bottom of the pit.  George also repaired some of the masonry which had broken out where the hinge for the cart shed door was fitted.

Tuesday, 23 October 2012

Sack hoist and kiln work

Our attempts to reurrect some kind of sack hoist continue.  It looks as though we need to spool the rope round the shaft rather than the pulley of the layshaft to get a controllable speed.  The pulley is 0.7m diameter, so would lift about 2m per revolution.  As it is geared up 80/11 from the pit wheel, by my calculations at 10 wheel revs per minute it would lift at about 8 feet per second.  Anyway, we have started moving the sheaves to where they will need to be and planning where the rope will run.

We also started to lay out the position of the walls of the kiln using the plans drawn up by the people who restored the mill around 1990.  There seem to be one or two inconsistencies in the dimensions, but we concluded that the front wall, which housed the firebox, would have been where the plank is on this photo - blocking a good part of the existing passageway.

Tuesday, 16 October 2012

Apple Day and Beyond

Last Sunday was Apple Day at Acorn Bank - the event was a success.  The weather was better than it has often been recently, and the planning had allowed for wet fields.  The planners had moved the parking to a different field, and put the stallholders' tents along the path from the house to the mill. The public entrance was part way along, nearer the mill than the house, which brought us a lot of visitors.  We were milling and also, very successfully, selling our flour and loaves made from it by an artisan baker.  We were joined again by Stuart Hobbs from Heron Mill - thanks for all the help, Stuart.

Today (Tuesday) we carried on painting the brackets for the launder rebuild.  Ray started adding side cheeks to the layshaft pulley so we can use it for a modified sack hoist,though it will run rather fast.  Bob bagged some flour, including trying out some new sample bags.  The local engineering works sent the taper repair plates for the shelling stones in for us to mark the positions for the screw holes.  Richard marked them out, then Bob helped him drill pilot holes.

Tuesday, 9 October 2012

A brief catchup

Sorry to have missed a few weeks - a combination of holidays and a couple of mill visits which I'm still trying to catch up for the blog.

Recent jobs have included:
  • Making brackets out of mild steel strip for the future renovation of the launder.
  • Clearing the upper reaches of the headrace.
  • Raising the bank of the lowest part of the headrace so that it won't overflow and wash the path away.
  • Continuing to fill in the voids in the stonework in the mill building.
  • Converting a large box to make a storage cupboard for flour bagging equipment and an old radiogram cabinet to make a bookcase.
  • Keeping on making and bagging flour to try to keep up with demand.

Today we also starrted looking at photos and drawings of the kiln, trying to visualise how it fitted in the ruined space we now have.
 

We would really like to start stabilising the stonework with a view to rebuilding the structure.  The other idea is a to put a bridge through the kiln between the information room and the upper floor of the mill so that visitors can see the milling process from a different angle; it would also make access better for the disabled.  However we found that the information room floor is a whole foot (30cm for the younger reader) higher than the mill floor.  This will lead to some challenges in the design of the walkway.