Tuesday, 5 February 2013

Progress slow in the snow

The view from the mill in the heaviest snow
 Pretty, isn't it?  But a darned nuisance - apart from the difficulty of working in snow, we need to point the piers before we can begin building the launder, and we can't use the lime mortar below 5 degrees C.

Nonetheless, we did get some cleaning up done ready for the weekend opening of Acorn Bank this weekend, putting tools away and helping Sara to sweep the mill room.  We also managed to do some work on the piers, and repair the two tarpaulin covers we put up last week, just before it got very windy!
The launder having been removed, there was no fence between the public path and the space under and beyond the launder.  The visiting public needed to be protected from the hazards of these areas, especially alongside the steps.  Richard and I dismantled the rough crate that the lime mortar was delivered in, and reassembled the bits to make a crude but effective fence.

Tuesday, 29 January 2013

Working outside in bad weather

The hydraulic lime we ordered last week had actually arrived; we had to store it up at the house to protect it from frost.  The scaffolders had been to amend the end fence so we can now get to the spillway stonework, so work on the launder can begin.  However, the weather is alternately frosty and wet, neither of which suits the lime mortar, so we put up a couple of plastic sheets to keep the rain off.  It has been very windy since...
 A group of conservation people from Sizergh were working at the house, and they wanted to be shown round the mill; naturally we obliged.  We also did some minor chores - including continuing to sort our huge collection of mixed screws by size!!!!


Tuesday, 22 January 2013

Winter weather

Some of the parts of the second waterwheel

 It has been a bit nippy these past 2 Tuesdays, so progress on the launder has been rather slow.  However, last week the scaffold had been erected, though not exactly as we wanted it.  It is much safer working between the launder and the spillway pit, but they have put a fence at the spillway end which prevents us getting to the stonework.
We were therefore at least able to do a  few preparatory jobs.  There is also a project to restore the mill barn, so we had to remove a few mill artifacts from it - such as the shroud plates from the second waterwheel.  These may not look much, but need 3 men to move them safely.
George and Richard clean up
the spillway

Today there was no Ray, as he was digging his car out of the snow.
We all helped to remove the large old, delaminating stone from the edge of the spillway, remove the loose stones below it, and tidy up the mortar. George carried on tidying up the stones and mortar in the general launder area.  We seem to have acquired a suitable replacement for the top stone from the former greenhouse floor.  Ian, the Trust buildings man, has approved the lime mortar we plan to use to rebuild the spillway, so this can now go ahead.


Bob and Richard mounted the two new pulley brackets for the revised sack hoist.  Richard had fabricated them to the measurements Bob took a few weeks ago, and they were painted last week.  Everything went together without too much of a problem.

Richard fixes the pulley bracket; note the
rare glimmer of sunshine!


Tuesday, 8 January 2013

Preparing to rebuild the launder

A useful session meeting Ian, a surveyor who works in the NT buildings department.  He is going to be our contact for building type jobs.  He said that what we were proposing to do with the launder was fine.

For the rest of the day, Ray and Richard did some work on the spillway end of the launder, and on the end of the part we rebuilt a couple of years ago.

Bob helped George to clean up old mortar and re-bed the top stones of the two intermediate piers.  We left them covered with plastic sheet (the old pond liner rides again!) so that, with any luck, the piers will dry out so they can be repointed next week.

The scaffold is expected to be installed this week, so we will be protected from the drop into the spillway pit - especially when it is wet or icy underfoot.



Tuesday, 11 December 2012

Last volunteer workday of the year

No pictures in today's freezing fog.

Richard, George and I finished demolishing the launder and stacked all the bottom planks and side support boards, as well as the control gates, tidily out of the way.  We hope to use some of the timber to build a new run-off chute for the dump valve.

When we meet again next year we expect to be meeting a Trust building man to discuss the kiln and launder rebuilds, and Sara has arranged for some scaffolding so we can hover safely above the spillway pit while rebuilding the launder.  We also need to have a safe platform while rebuilding the lip of the spillway itself.

Well, I guess that's it for 2012.  Merry Christmas and Happy New Year to all our readers!

Tuesday, 4 December 2012

Farewell plastic pond liner

 Today we began to dismantle the old launder.  We had to remove the plastic pond liner that has kept us more-or-less watertight for the past 2 seasons, then knock the bottom planks out with a very big hammer.  Because the weather was very cold, and there had been snow recently, the launder had a good layer of ice, and you can see George shovelling some of it away.




Earlier, when we first arrived, we found that the huge stack of timber for the launder and the waterwheel lining had been delivered - in fact it was delivered last Friday and had spent the weekend freezing into a solid lump.  We scraped the ice off, managed to separate the boards, and got them all safely stored by lunchtime.  All the screws and other hardware had been delivered up at the house, along with our very own assemble-it-yourself wheelbarrow.  We therefore assembled the barrow fingertight so we could wheel the ironmongery down to the mill.

After lunch we had a useful forward planning meeting with Sara.

Tuesday, 27 November 2012

A couple more weeks' odd jobs

Richard cleans the burr stone
 Over the past 2 Tuesdays we have pottered ahead:

  • We finished cleaning the burr stones and tun, including dismantling, cleaning and re-lubricating the top bearing, before putting the whole thing back together.
  • We sorted some of the stones in the kiln room to try to identify the ones that made up the arch.
  • We began to dismantle the launder ready for rebuilding.  This started with the removal of the wooden railings and some of the bolts holding the side joining plates.
  • We designed the fixings for two pulleys to run the rope for the sack hoist under the hurst staging where it eventually wraps round the lay shaft.
  • We continued to work on the shelling stone stone nut.
  • We made a box to contain the sand counterweight that sits on the dump valve lever.
  • We had a long meeting with Sara and Trust archaeologist Jamie Lund to discuss the project to rebuild the kiln and improve visitor access.
  • We helped garden volunteer Jim to celebrate his birthday by eating the enormous chocolate cake his wife had provided.

Mike prepares the launder
...with George