Saturday, 4 May 2013

The Independent on Sunday Happy List

Another accolade for the mill volunteers.  Last Sunday the Independent on Sunday published its "Happy List" of 100 people "whose volunteering, caring, fundraising, mentoring, charity founding or selflessness makes Britain a more contented, supportive, better-adjusted and happier place."   And the Acorn Bank Watermill volunteers were first (alphabetically) in the list!

Our entry reads: 
"Acorn Bank Watermill Volunteers
Heritage lovers
Richard Harland, Ray Gill and Bob Price form the trio who painstakingly restored and now maintain an ancient mill at Temple Sowerby, Cumbria. For five years they have helped to rebuild the wooden structure, and the mill is now able to grind flour for the first time in over 70 years."

The full article can be seen at

http://www.independent.co.uk/news/people/news/the-independent-on-sunday-happy-list-2013-8591000.html

Tuesday, 30 April 2013

Tidying up and getting ready to mill

A full house today, Richard, Ray, Bob, George, Mike and Peter. Between us we tackled some finishing-off jobs.

The information board explaining the Lower Mill Machinery had fallen off the fence and needed to be re-displayed.  We had been thinking for some time that it was in the wrong place, as visitors saw it on entering the mill and thought it referred to the main machinery.  Ray and Bob decided to make a stand for it so it would be more relevant.

They then went on to repair part of the fence on the viewing platform.
 George and Mike carried on pointing and replacing the cobbles where we had inserted the new fence above the spillway pit.  In the previous couple of weeks when I wasn't there, the volunteers built a new trough to catch the water spilling from the dump valve.  Peter can be seen here extending and lining it.

Richard meanwhile got the machinery set up and ready to start milling. At the end of the afternoon the year's first delivery of wheat arrived and had to be manhandled across the yard and upstairs.  Not good for the back - we must get the sack hoist working.
We also put the cob oven back into some kind of usable state.  We had rather neglected it, because it would have had to be rebuilt when the barn was restored, but that project has been held up by the possibility of bats.  We cleaned it up, fitted a new tarpaulin and George skinned the outer surface with fresh lime mortar.

Wednesday, 3 April 2013

Tidying up the launder area

The launder has gone together slightly different that the previous version, so we have had to make one or two adaptations, including to the gate valve.

We have now finished the work on the launder, apart from the pointing (which we still can't do as the weather remains stubbornly below the required 5 degrees) and stopping up one or two leaks (also difficult at present temperatures).  It has been the coldest March for 66 years, apparently.

We therefore began tidying up by removing a lot of the rubble, sacks and bags we had been using or had left about. We also began to replace and repair the fencing.  As you can see, the section of fence alongside the steps is now back in place, as is the guard rail for the gate valve adjusting platform and part of the temporary fence has been removed.

Tuesday, 26 March 2013

Easter coming up, and still snowing

We were joined today by a new mill volunteer - welcome, Lesley! She rapidly got stuck in to cleaning and tidying part of the workshop. Ray was still snowed in in Weardale.

Meanwhile we managed to do some finishing off outside.  We replaced the little bit of fence from the launder to the wall next to the kiln door (back left corner of this picture) and finished off the new fence between the launder and the spillway pit.

George re-bedded the new spillway stone, which had come adrift in the frosts.  We generally tidied things up, hoping to be able to turn the machine over Easter weekend.  We will not be milling for a few more weeks.

We also completed the flour desiccation test - we bagged 1532g of flour in June 2012 and I have kept it at home to see how much weight it loses by drying out over its 6 month shelf life.  We meant to weigh it again in December, but weather and other stuff was against us, so we did it today and interpolated the weight at 6 months.  It was OK, so we know we need to continue bagging 1530g of flour in our 1.5kg bags.

Tuesday, 19 March 2013

Mud and fencing

 Today the estate staff (Robert, Sam the lone ranger, and Jim the volunteer) cleared muck from the major part of the headrace.  Here you can see the resulting mucky bank.

There was no Ray (snowed in again), but the rest of us got on with fitting the metal post sockets for the new fence alongside the spillway pit.

 

Tuesday, 12 March 2013

Mud, glorious mud


 The Friday team had finished the launder boarding last week, but there is still a lot of pointing to do.  As the pictures show, it wasn't the weather for it - snow, bitterly cold, and more of the same forecast.

So we started work on clearing the silt and leaves from the headrace.  Breaking the ice and scooping out 6 to 10 inches of slimy, smelly mud, and disposing of it down the bank, proved to be back-breaking work.
 At the end of  the day (or at least as much of it as we could cope with), we had done at least something towards clearing about 30 metres.  Just another 400 to go.

Tuesday, 5 March 2013

Reboarding the launder

 The launder is coming on nicely now, after Richard and others put in an extra day last Friday.  You can see in the picture how far they had got, and more progress was made today.  You can also see George in the background replacing the rail on the fence over the pit near the wheelhouse.

Peter and I continued preparing the larch boards for the launder, and brushing and painting the control lever for the gate valve.

The way the launder is being constructed can be seen here.  The side beams are 50mm thick oak, with the joining pieces made of the same and bolted on.  The bottom boards are 40mm thick larch, 40 inches long by about 10 inches wide (sorry about the mixed units, but those are the measurements that work!),  rebated 20mm x 20mm along each long edge to give a stepped joint.  The joints between boards and under the side beams are sealed with Roofer's Mate, which dries to a nice, inert, rubbery gasket.  The boards are screwed from underneath using Screwfix M8 x 70mm Turbo Coach Screws.  As you can also see in the picture, we have protected the core of the stone piers from any leakage water by reusing squares of the old plastic pond liner.