The mild steel plates to improve the fit of the shelling stone stone nut have come back from the engineering works, cut out, drilled and tapped. We cut the lengths of 14mm studding and started to file the plates to improve the fit still further. We need to refit the shelling stone before we can continue with the...
...sack hoist. We took down two pulleys that had been used by the original restorers as part of the inoperable sack hoist. After cleaning them up we gave them a coat of red oxide primer. We cut some 10mm studding and two angle-iron plates to clamp timbers to one of the roof beams to carry the first pulley over the trap doors. Ray is gong to make two further wooden pulleys to direct the rope under the hurst frame.
Meanwhile sorting of the stone in the kiln started, and some of the dirt and rubble was removed from the bottom of the pit. George also repaired some of the masonry which had broken out where the hinge for the cart shed door was fitted.
Acorn Bank Garden and Watermill is located at Temple Sowerby, around six miles east of the town of Penrith. The garden and watermill are owned by the National Trust. The watermill is now leased from the National Trust and is operated by the former volunteers, who have formed Acorn Bank Watermill Trust, registered charity no 1193320
Tuesday, 30 October 2012
Tuesday, 23 October 2012
Sack hoist and kiln work
Our attempts to reurrect some kind of sack hoist continue. It looks as though we need to spool the rope round the shaft rather than the pulley of the layshaft to get a controllable speed. The pulley is 0.7m diameter, so would lift about 2m per revolution. As it is geared up 80/11 from the pit wheel, by my calculations at 10 wheel revs per minute it would lift at about 8 feet per second. Anyway, we have started moving the sheaves to where they will need to be and planning where the rope will run.
We also started to lay out the position of the walls of the kiln using the plans drawn up by the people who restored the mill around 1990. There seem to be one or two inconsistencies in the dimensions, but we concluded that the front wall, which housed the firebox, would have been where the plank is on this photo - blocking a good part of the existing passageway.
We also started to lay out the position of the walls of the kiln using the plans drawn up by the people who restored the mill around 1990. There seem to be one or two inconsistencies in the dimensions, but we concluded that the front wall, which housed the firebox, would have been where the plank is on this photo - blocking a good part of the existing passageway.
Tuesday, 16 October 2012
Apple Day and Beyond
Last Sunday was Apple Day at Acorn Bank - the event was a success. The weather was better than it has often been recently, and the planning had allowed for wet fields. The planners had moved the parking to a different field, and put the stallholders' tents along the path from the house to the mill. The public entrance was part way along, nearer the mill than the house, which brought us a lot of visitors. We were milling and also, very successfully, selling our flour and loaves made from it by an artisan baker. We were joined again by Stuart Hobbs from Heron Mill - thanks for all the help, Stuart.
Today (Tuesday) we carried on painting the brackets for the launder rebuild. Ray started adding side cheeks to the layshaft pulley so we can use it for a modified sack hoist,though it will run rather fast. Bob bagged some flour, including trying out some new sample bags. The local engineering works sent the taper repair plates for the shelling stones in for us to mark the positions for the screw holes. Richard marked them out, then Bob helped him drill pilot holes.
Today (Tuesday) we carried on painting the brackets for the launder rebuild. Ray started adding side cheeks to the layshaft pulley so we can use it for a modified sack hoist,though it will run rather fast. Bob bagged some flour, including trying out some new sample bags. The local engineering works sent the taper repair plates for the shelling stones in for us to mark the positions for the screw holes. Richard marked them out, then Bob helped him drill pilot holes.
Tuesday, 9 October 2012
A brief catchup
Sorry to have missed a few weeks - a combination of holidays and a couple of mill visits which I'm still trying to catch up for the blog.
Recent jobs have included:
Today we also starrted looking at photos and drawings of the kiln, trying to visualise how it fitted in the ruined space we now have.
We would really like to start stabilising the stonework with a view to rebuilding the structure. The other idea is a to put a bridge through the kiln between the information room and the upper floor of the mill so that visitors can see the milling process from a different angle; it would also make access better for the disabled. However we found that the information room floor is a whole foot (30cm for the younger reader) higher than the mill floor. This will lead to some challenges in the design of the walkway.
Recent jobs have included:
- Making brackets out of mild steel strip for the future renovation of the launder.
- Clearing the upper reaches of the headrace.
- Raising the bank of the lowest part of the headrace so that it won't overflow and wash the path away.
- Continuing to fill in the voids in the stonework in the mill building.
- Converting a large box to make a storage cupboard for flour bagging equipment and an old radiogram cabinet to make a bookcase.
- Keeping on making and bagging flour to try to keep up with demand.
Today we also starrted looking at photos and drawings of the kiln, trying to visualise how it fitted in the ruined space we now have.
We would really like to start stabilising the stonework with a view to rebuilding the structure. The other idea is a to put a bridge through the kiln between the information room and the upper floor of the mill so that visitors can see the milling process from a different angle; it would also make access better for the disabled. However we found that the information room floor is a whole foot (30cm for the younger reader) higher than the mill floor. This will lead to some challenges in the design of the walkway.
Tuesday, 21 August 2012
Gypsum mine artefact
Richard and Ray decided to try to excavate a truck from the former gypsum mine. It was lying quite well buried at the foot of a slope near the drift mine, and is lacking wheels and side panels, but the frame seems quite sturdy. It took most of the day, but they seem to have got it out. A working party will be needed to drag it up the slope.
Ray had made a pair of plywood reinforcements for the square hole in the lid of the Really Useful Box we collect the flour in - the lid had cracked in use. Bob drilled and fitted the reinforcements (this required the points of the screws to be filed off). It was agreed that nuts and bolts would not be suitable, as the nuts could fall off into the flour.
Mike was continuing to paint the walls with limewash.
Later, Mike and Bob bagged all the remaining flour, but more will be needed for the Bank Holiday weekend.
Ray had made a pair of plywood reinforcements for the square hole in the lid of the Really Useful Box we collect the flour in - the lid had cracked in use. Bob drilled and fitted the reinforcements (this required the points of the screws to be filed off). It was agreed that nuts and bolts would not be suitable, as the nuts could fall off into the flour.
Mike was continuing to paint the walls with limewash.
Later, Mike and Bob bagged all the remaining flour, but more will be needed for the Bank Holiday weekend.
Tuesday, 14 August 2012
Improving power
![]() |
| Nic gets to grips with one of our headrace hoes |
While Mike and George continued improving the state of the internal walls of the milling room, we had a visit from NT Business Support person, Nic Frampton. She indicated she would like to help, so we set her to clearing the last section of the headrace. In half an hour she shifted a lot of sludge.
Ray and Richard were working on fitting pieces of plastic pond liner inside the wheel buckets as a temporary repair, pending having the time and wood to repair it properly. Unfortunately, we only had a limited amount left, so they had to prioritise the worst buckets.
Later Bob drove over to Little Salkeld to collect some more wheat and flour bags.
Tuesday, 7 August 2012
Bagging at last
Richard and Ray used the new jack support beam to lift the inner end of the main shaft so that the bearing could be cleaned and re-greased. The first picture shows the bearing with the top cover and most of the grease removed.
The second shows Richard adjusting the position of the jack so that the shaft lifted exactly vertically - otherwise it tended to lean on the bearing shell and stop it being moved.
Once everything was in order, the bearing shell was removed. The wear is easily visible and eventually a new one may be needed.
Meanwhile Bob siliconed under the edge trims of the bagging bench worktop (which Ray had fitted earler) and continued to put sealant on the internal corners of the grain storage bin.
Once the sealant was dry Bob took the opportunity of trying on the protective clothing so he could sieve and bag the flour we milled on 10th July. That gives us 12 bags we can sell at the weekend.
George spent the day cleaning up and re-pointing the damp walls in the public part of the mill room. he is later going to put waterproof sealant and limewash on them.
The second shows Richard adjusting the position of the jack so that the shaft lifted exactly vertically - otherwise it tended to lean on the bearing shell and stop it being moved.
Once everything was in order, the bearing shell was removed. The wear is easily visible and eventually a new one may be needed.
Meanwhile Bob siliconed under the edge trims of the bagging bench worktop (which Ray had fitted earler) and continued to put sealant on the internal corners of the grain storage bin.
Once the sealant was dry Bob took the opportunity of trying on the protective clothing so he could sieve and bag the flour we milled on 10th July. That gives us 12 bags we can sell at the weekend.
George spent the day cleaning up and re-pointing the damp walls in the public part of the mill room. he is later going to put waterproof sealant and limewash on them.