No pictures in today's freezing fog.
Richard, George and I finished demolishing the launder and stacked all the bottom planks and side support boards, as well as the control gates, tidily out of the way. We hope to use some of the timber to build a new run-off chute for the dump valve.
When we meet again next year we expect to be meeting a Trust building man to discuss the kiln and launder rebuilds, and Sara has arranged for some scaffolding so we can hover safely above the spillway pit while rebuilding the launder. We also need to have a safe platform while rebuilding the lip of the spillway itself.
Well, I guess that's it for 2012. Merry Christmas and Happy New Year to all our readers!
Acorn Bank Garden and Watermill is located at Temple Sowerby, around six miles east of the town of Penrith. The garden and watermill are owned by the National Trust. The watermill is now leased from the National Trust and is operated by the former volunteers, who have formed Acorn Bank Watermill Trust, registered charity no 1193320
Tuesday, 11 December 2012
Tuesday, 4 December 2012
Farewell plastic pond liner
Today we began to dismantle the old launder. We had to remove the plastic pond liner that has kept us more-or-less watertight for the past 2 seasons, then knock the bottom planks out with a very big hammer. Because the weather was very cold, and there had been snow recently, the launder had a good layer of ice, and you can see George shovelling some of it away.
Earlier, when we first arrived, we found that the huge stack of timber for the launder and the waterwheel lining had been delivered - in fact it was delivered last Friday and had spent the weekend freezing into a solid lump. We scraped the ice off, managed to separate the boards, and got them all safely stored by lunchtime. All the screws and other hardware had been delivered up at the house, along with our very own assemble-it-yourself wheelbarrow. We therefore assembled the barrow fingertight so we could wheel the ironmongery down to the mill.
After lunch we had a useful forward planning meeting with Sara.
Earlier, when we first arrived, we found that the huge stack of timber for the launder and the waterwheel lining had been delivered - in fact it was delivered last Friday and had spent the weekend freezing into a solid lump. We scraped the ice off, managed to separate the boards, and got them all safely stored by lunchtime. All the screws and other hardware had been delivered up at the house, along with our very own assemble-it-yourself wheelbarrow. We therefore assembled the barrow fingertight so we could wheel the ironmongery down to the mill.
After lunch we had a useful forward planning meeting with Sara.
Tuesday, 27 November 2012
A couple more weeks' odd jobs
![]() |
| Richard cleans the burr stone |
- We finished cleaning the burr stones and tun, including dismantling, cleaning and re-lubricating the top bearing, before putting the whole thing back together.
- We sorted some of the stones in the kiln room to try to identify the ones that made up the arch.
- We began to dismantle the launder ready for rebuilding. This started with the removal of the wooden railings and some of the bolts holding the side joining plates.
- We designed the fixings for two pulleys to run the rope for the sack hoist under the hurst staging where it eventually wraps round the lay shaft.
- We continued to work on the shelling stone stone nut.
- We made a box to contain the sand counterweight that sits on the dump valve lever.
- We had a long meeting with Sara and Trust archaeologist Jamie Lund to discuss the project to rebuild the kiln and improve visitor access.
- We helped garden volunteer Jim to celebrate his birthday by eating the enormous chocolate cake his wife had provided.
![]() |
| Mike prepares the launder |
![]() |
| ...with George |
![]() |
| Jim and his cake |
Wednesday, 14 November 2012
Another busy Tuesday
![]() |
| Before we started, we had to have a picture of all 3 of us with our Marsh Heritage Award |
We carried on fitting the first pulley for our revised sack hoist, first filing out the casting to fit the bolt we used as axle, then mounting it between the wooden supports. We gave a lot of thought to the lift itself, as it would be useful to be able to hoist our "Really Useful" boxes as well a sacks. A platform, with or without sides, attached by chains which would open the trapdoor, seemed to be favourite. We also removed the stop mechanism actuator from the old sack hoist because it was in the way. In the process we revealed quite a lot of woodworm activity in the roof truss - fortunately only in the outer few mm.
Richard carried on fitting the discs to the No 1 stone nut, and George and Mike cleared 8 barrowloads of rubble from the pit. We fitted a bolt to the new "gate" across the front of the kiln.Later we dismantled the tun and lifted the No 2 runner stone so we could hoover out all the grain and stuck flour. We left the stone supported on blocks so we can lift it fully and check the bearing
Monday, 12 November 2012
Presentation of the Marsh Heritage Volunteering Award
| Bob and Richard receive the award from Brian Marsh applauded by Dame Fiona Reynolds |
On Saturday November 10th Bob and Richard, with Sylvia, attended the AGM of the National Trust to collect their Marsh Heritage Award.
The AGM itself was much more interesting than we had expected. The big names at the helm of the Trust, particularly the Chairman Simon Jenkins, proved to be very good at fielding questions from the floor and delivering thoughtful and believable answers.
The meeting was dominated by the departure of the Director General, Dame Fiona Reynolds. She had obviously created a powerful impression on those she worked with, and earned deep respect and loyalty. The tributes paid to her were very fulsome and emotional.
| Brian Marsh poses with us and our plaque and certificate |
The time finally came for us to go up on the stage and receive our plaque and certificate from the founder and chairman of the Marsh Christian Trust, Brian Marsh, to loud applause from the large crowd of members at the meeting.
This may not be the place to discuss it, but I couldn't help feeling there is a disconnect between the lofty ideals of Simon Jenkins & co and the reality of the 67,000 volunteers who are mainly loyal to their property rather than the abstraction of the Trust.
![]() |
| The Plaque |
![]() |
| The Certificate |
Tuesday, 6 November 2012
Access to the kiln
![]() |
| Richard surveys the newly-hinged fence |
Richard continued to file the steel discs for the shelling stone stone-nut to improve their fit on the taper.
We also removed the handle and main gear from the winnower so the handle shaft can be repaired.
Tuesday, 30 October 2012
Shelling stones and sack hoist continued
The mild steel plates to improve the fit of the shelling stone stone nut have come back from the engineering works, cut out, drilled and tapped. We cut the lengths of 14mm studding and started to file the plates to improve the fit still further. We need to refit the shelling stone before we can continue with the...
...sack hoist. We took down two pulleys that had been used by the original restorers as part of the inoperable sack hoist. After cleaning them up we gave them a coat of red oxide primer. We cut some 10mm studding and two angle-iron plates to clamp timbers to one of the roof beams to carry the first pulley over the trap doors. Ray is gong to make two further wooden pulleys to direct the rope under the hurst frame.
Meanwhile sorting of the stone in the kiln started, and some of the dirt and rubble was removed from the bottom of the pit. George also repaired some of the masonry which had broken out where the hinge for the cart shed door was fitted.
...sack hoist. We took down two pulleys that had been used by the original restorers as part of the inoperable sack hoist. After cleaning them up we gave them a coat of red oxide primer. We cut some 10mm studding and two angle-iron plates to clamp timbers to one of the roof beams to carry the first pulley over the trap doors. Ray is gong to make two further wooden pulleys to direct the rope under the hurst frame.
Meanwhile sorting of the stone in the kiln started, and some of the dirt and rubble was removed from the bottom of the pit. George also repaired some of the masonry which had broken out where the hinge for the cart shed door was fitted.