![]() |
The third runner stone lifted |
This involved the usual process of lifting and supporting the runner and removing the bearing (strips of wood) from the cast iron fitment in the bedstone.

The box was then fixed back in the wall with lime mortar, and the beam re-inserted and hung from the tentering bar. The final picture shows Richard and Peter fixing the box.
No comments:
Post a Comment